ALALA / Control Panel Engineering
由 ALALA 提供初步 I/O 与预算配置。固定报价前须经工程审核。
1–6 pumps are calculated automatically. More than 6 pumps are routed for engineering review.
If unknown, select “Unknown / Not available” so the system can use a standard assumption for preliminary estimation.
Add measuring instruments with their signal or communication method.
Remote commands require local/remote selection, enablement, confirmation and audit review.
Engineering design · assembly · FAT · installation · commissioning · after-sales service
仅支持 PDF、JPG、JPEG、PNG、WebP、XLSX、CSV 和 DOCX;每个文件最大 10 MB。